Each page follows the same shape. A numbered stage list carries the work in order, and on the Maidstone job nine of the thirteen stages happen before anything is fitted: survey, load confirmation, roof assessment, plant space, load profile, then several system designs.
Two photographs sit with each study, and the Dragonfly Farm one also carries a video.
Two of the three also list the starting state alongside the finished one. That pairing is the useful part if you are picturing your own building afterwards, because it says plainly what was absent at the start rather than only what was added.