An EICR on a typical home costs £100-£330 plus VAT in 2026 (Which?). What moves the price in Kent, landlord rules, codes and remedial costs, sourced.
Quick answer: Which?’s May 2026 price guide puts an electrical inspection report on a standard home at £100 to £330, excluding VAT, for four to eight hours of inspection and testing. The figures come from a survey of 19 Which? Trusted Traders in November 2025. With VAT at the standard rate of 20%, that is £120 to £396. What you pay within that range depends on the size and condition of the installation, not on the town, and any remedial work is priced separately.
This guide sets out what drives the price in Kent and South East London, what landlords have to do, what the codes on the report mean for the bill, and how to compare quotes. If you would rather book the inspection, our EICR testing in Kent page explains how we carry it out and what you get at the end.
What the published prices say
We use Which?’s figures because it publishes how they were gathered. Its May 2026 guide gives these ranges, the fuse box row for a standard three-bedroom semi-detached house:
| Job | Time on site | Price, excluding VAT | With VAT at 20% |
|---|---|---|---|
| Electrical inspection report (EICR) | 4 to 8 hours | £100 to £330 | £120 to £396 |
| Replace a fuse box | Half a day to a day | £500 to £1,500 | £600 to £1,800 |
Source: Which?, “How much do electricians cost?”, 1 May 2026; prices from a survey of 19 Which? Trusted Traders in November 2025, labour and materials, excluding VAT. VAT column worked at the 20% standard rate.
The fuse box row is there because a replacement consumer unit is the single most common big-ticket item an EICR leads to on an older house. It is a separate job from the inspection.
What moves the price of an EICR
An EICR is priced on time, and the time depends on what has to be inspected and tested. The main factors are:
- The number of circuits. Every circuit is tested on its own: continuity, insulation resistance, polarity, earth fault loop impedance and RCD operation. More circuits means more hours.
- The number of distribution boards. A house with a second board for an extension, a garage or a garden office takes longer than one with a single consumer unit.
- Access. A board behind a fitted cupboard, a loft with no boarding or furniture stacked against sockets all add time.
- Age and condition. An older installation with undocumented alterations takes longer to trace, and is more likely to need a follow-up visit.
- Whether the property is occupied. Parts of the testing need the supply off. In an occupied home or a business, the inspector has to work around the people in it.
The town does not change much. A three-bedroom semi in Maidstone and one in Bromley take the same tests.
The extent of the inspection, and sampling
Before the inspection starts, you and the inspector agree its extent: which parts of the installation are covered, and whether accessories such as sockets and switches are sampled rather than every one opened up. That agreement is written into the report under its extent and limitations.
Sampling keeps the price down on a large installation, but it is a choice. If the sample turns up problems, the inspection should be widened. When you compare two quotes, check that they cover the same extent, or you are comparing different jobs.
EICR costs for landlords in Kent and South East London
If you let a home in England, the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 apply. You must:
- have the electrical installation inspected and tested at least every five years, or sooner if the last report says so;
- give a copy of the report to existing tenants within 28 days, and to a new tenant before they move in;
- give a copy to the council within seven days if it asks in writing;
- have any remedial work the report calls for done within 28 days, or sooner if the report says so.
An amendment that took effect on 1 November 2025 extended the regulations to social landlords and raised the maximum financial penalty to £40,000, from £30,000 (SI 2025/1043).
Some councils add a licensing layer. Croydon Council’s selective licensing scheme covers privately rented homes in 14 of its wards, and its licence conditions ask for an EICR every five years. Our Croydon electrician page lists the wards. For the rest of a landlord’s electrical duties, read our guide to landlord electrical checks.
For a landlord, the useful way to think about the cost is per year: a five-yearly inspection at the Which? range works out at £20 to £66 a year before VAT.
What the codes mean for your bill
Every observation on the report is coded, and the codes decide what you have to spend next:
- C1, danger present. A risk of injury now, which needs making safe straight away, usually by isolating the circuit.
- C2, potentially dangerous. Not dangerous this minute, but it could become so. Remedial work is urgent, and for a landlord it is due within 28 days.
- C3, improvement recommended. A departure from the current standard that is not dangerous. You can plan it, or leave it.
- FI, further investigation. Something the inspector could not resolve within the agreed extent. It means another visit, not necessarily a repair.
Any C1 or C2 makes the report unsatisfactory. Under BS 7671:2018+A4:2026, the IET explains that an FI no longer makes a report unsatisfactory on its own, so an older report may read differently from a new one. Our guide to EICRs for business premises goes through the codes in more detail.
Typical remedial work after an EICR
The report tells you what is wrong, not what the fix costs. Common follow-up jobs on older houses include:
- A replacement consumer unit. Which? gives £500 to £1,500 excluding VAT for a three-bedroom semi. It is notifiable work under Part P, so it needs certifying; our guide to Part P explains how. See our consumer unit upgrades page.
- Missing or inadequate RCD protection on socket circuits, often fixed by the same board change.
- Earthing and bonding to the incoming gas and water pipes, where it is missing or undersized.
- Damaged accessories, such as cracked sockets or scorched switches, replaced like for like.
- A partial or full rewire, where the insulation tests show the old cable has deteriorated.
Ask for each item to be priced separately, so you can see which ones the report says are urgent.
How to compare EICR quotes
Five questions sort like-for-like quotes from cheap ones:
- Does the price cover the whole installation, or a sample? What extent is assumed?
- Is VAT included? A VAT-registered business adds it at 20%.
- Is a full schedule of test results included, circuit by circuit, or only a summary page?
- Is remedial work quoted separately, after you have seen the report?
- Who signs the report, and what qualification do they hold?
A single page saying “satisfactory” with no schedule of test results attached is not a complete EICR. The schedule is the part a future inspector, a buyer’s solicitor or a council will want to see.
Commercial EICRs
Shops, offices and workshops are priced the same way, on circuits and boards, but there are usually more of both, and testing may have to happen out of hours. No law names the EICR for business premises, but the Electricity at Work Regulations 1989 require the installation to be maintained to prevent danger, and an EICR is the usual way to show it. Our commercial electrician page covers the wider work we do for businesses.
Homeowners: when an EICR is worth paying for
An owner-occupier is not legally required to hold an EICR. It is still worth the money in a few situations: before buying a house with old wiring, before a renovation, after a flood or a fire, or when no one can say when the installation was last tested. If you are already planning electrical work, our domestic electrician page sets out what we do.
Getting an EICR in Kent and South East London
We carry out EICRs from our Keston office across Kent and South East London, including Sevenoaks, Bromley, Croydon and Orpington. We price each inspection to the installation, and quote any remedial work separately once you have seen the report. Book through our EICR testing in Kent page or call 0800 112 5050.
Frequently asked questions
How much does an EICR cost for a three-bedroom house?
Which?’s May 2026 price guide puts an electrical inspection report on a standard home at £100 to £330, excluding VAT, from a survey of 19 of its Trusted Traders in November 2025. With VAT at the standard 20%, that is £120 to £396. The price follows the number of circuits and how easy the installation is to reach.
How long does an EICR take?
Which? gives four to eight hours for a standard home. A small flat with one consumer unit sits at the short end; a large house with extensions, outbuildings or a second distribution board sits at the long end.
Is remedial work included in the price of an EICR?
No. The inspection and the repairs are separate jobs. Ask for the inspection to be priced on its own, and for any remedial work to be quoted once you have seen the report and its codes.
How often does a landlord need an EICR?
At least every five years in England, or sooner if the last report recommends an earlier date, under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020. Since 1 November 2025 a council can fine a landlord up to £40,000 for a breach.
Do homeowners need an EICR?
There is no legal requirement for an owner-occupier to hold one. Homeowners usually get one before buying or selling, after a flood or fire, or when the wiring is old enough that no one knows its condition.
Sources
- Which?, “How much do electricians cost?”, 1 May 2026 (survey of 19 Which? Trusted Traders, November 2025; prices exclude VAT): which.co.uk
- GOV.UK, VAT rates (standard rate 20%): gov.uk
- The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, regulations 3 and 11: legislation.gov.uk
- The Electrical Safety Standards in the Private Rented Sector (England) (Amendment) Regulations 2025, SI 2025/1043: legislation.gov.uk
- Croydon Council, Selective Licensing Scheme 2026, wards and licence conditions (read 14 November 2026): croydon.gov.uk
- The Electricity at Work Regulations 1989, regulation 4: legislation.gov.uk
- HM Government, Approved Document P, 2013 edition: gov.uk
01 More from the blog
Keep
reading.

Part P explained: which electrical work in your home needs building regulations sign-off (2026)
Which home electrical jobs are notifiable under Part P in England, room by room: new circuits, consumer units, bathrooms, and the certificates to expect.

Warm Homes Loan Scheme rules: what it covers for solar panels, batteries and EV chargers
The Warm Homes Loan Scheme rules for homes, checked 3 Nov 2026: who can borrow, the £15,000 solar and battery caps, EV chargers, MCS installers, audits.

Common Mistakes to Avoid When Installing an EV Charger at Home (2026)
Installing an EV charger at home? The 9 mistakes we see most: three-pin charging, supply and earthing checks, DNO notice, Part P and who the grant covers.